[ 
https://issues.apache.org/jira/browse/BEAM-4559?focusedWorklogId=114482&page=com.atlassian.jira.plugin.system.issuetabpanels:worklog-tabpanel#worklog-114482
 ]

ASF GitHub Bot logged work on BEAM-4559:
----------------------------------------

                Author: ASF GitHub Bot
            Created on: 21/Jun/18 21:19
            Start Date: 21/Jun/18 21:19
    Worklog Time Spent: 10m 
      Work Description: Ardagan commented on issue #5710: [BEAM-4559] Add 
latest post-commit tests status to GH PR
URL: https://github.com/apache/beam/pull/5710#issuecomment-399246849
 
 
   @alanmyrvold @swegner 
   Hi Alan and Scott,
   There are couple variations of layout of showing post-commit tests results 
in PR template. You can see those in the history of changes in this PR. Can 
you, please, check on those and provide feedback on which layout would be 
better? 
   Seems that we are at the stalemate situation right now and need more 
opinions.

----------------------------------------------------------------
This is an automated message from the Apache Git Service.
To respond to the message, please log on GitHub and use the
URL above to go to the specific comment.
 
For queries about this service, please contact Infrastructure at:
[email protected]


Issue Time Tracking
-------------------

    Worklog Id:     (was: 114482)
    Time Spent: 4h  (was: 3h 50m)

> Post-Commit tests stability
> ---------------------------
>
>                 Key: BEAM-4559
>                 URL: https://issues.apache.org/jira/browse/BEAM-4559
>             Project: Beam
>          Issue Type: Improvement
>          Components: testing
>            Reporter: Mikhail Gryzykhin
>            Assignee: Mikhail Gryzykhin
>            Priority: Major
>          Time Spent: 4h
>  Remaining Estimate: 0h
>
> [https://docs.google.com/document/d/1sczGwnCvdHiboVajGVdnZL0rfnr7ViXXAebBAf_uQME/edit#heading=h.t71pj6h7rd0w]
> Follow up on design doc specified above and implement required code work.
>  * Split existing post-commit tests jobs to automatically and manually 
> triggered [Done]
>  * Add tracking by JIRA bugs for failing test job
>  * Create document describing post-commit failures handling policies
>  * Add tests status badge to PR template
>  * Create dashboard for post-commit tests
>  * Detect and fix flaky java tests
>  



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to