Thomas Groh created BEAM-819:
--------------------------------
Summary: The DirectRunner can complete before reporting the
results of all ModelEnforcements
Key: BEAM-819
URL: https://issues.apache.org/jira/browse/BEAM-819
Project: Beam
Issue Type: Bug
Components: runner-direct
Reporter: Thomas Groh
Assignee: Thomas Groh
The termination condition in the
ExecutorServiceParallelExecutor.MonitorRunnable checks to see if the evaluation
context is done, among other things. Due to the signatures of ModelEnforcement,
output is committed before ModelEnforcement runs to ensure that the enforcement
has access to the final elements. If the transform that performs
ModelEnforcement completes, and all PTransforms are done, the pipeline can
shutdown before model enforcement fails.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)