Replace the pending flag with the release date
Project: http://git-wip-us.apache.org/repos/asf/buildr/repo Commit: http://git-wip-us.apache.org/repos/asf/buildr/commit/e718b0f4 Tree: http://git-wip-us.apache.org/repos/asf/buildr/tree/e718b0f4 Diff: http://git-wip-us.apache.org/repos/asf/buildr/diff/e718b0f4 Branch: refs/heads/master Commit: e718b0f48e1216fa0fcdb9531631bc41e89b2996 Parents: 04263f8 Author: Peter Donald <[email protected]> Authored: Fri Nov 28 20:04:02 2014 +1100 Committer: Peter Donald <[email protected]> Committed: Fri Nov 28 20:04:02 2014 +1100 ---------------------------------------------------------------------- CHANGELOG | 2 +- 1 file changed, 1 insertion(+), 1 deletion(-) ---------------------------------------------------------------------- http://git-wip-us.apache.org/repos/asf/buildr/blob/e718b0f4/CHANGELOG ---------------------------------------------------------------------- diff --git a/CHANGELOG b/CHANGELOG index f0a5738..e6defdd 100644 --- a/CHANGELOG +++ b/CHANGELOG @@ -1,4 +1,4 @@ -1.4.21 (Pending) +1.4.21 (2014-11-28) * Change: Update the gwt addon to add the validation dependencies required for GWT compiles without requiring that the user specify the dependency. * Change: Update ipr.add_gwt_configuration method to support GWT 2.7 configuration
