davsclaus commented on PR #3186:
URL: https://github.com/apache/camel-kamelets/pull/3186#issuecomment-6971969789

   The Integration Tests fail because of a regression in the Camel 
4.24.0-SNAPSHOT CLI, not because of this PR. The snapshot itself runs fine: 
each integration starts as Apache Camel (JBang) 4.24.0-SNAPSHOT and reaches 
Running.
   
   The failure is at the end of each test. Citrus runs `camel stop <pid>` with 
the pid of the launcher process, and the Camel JVM is a child of that process. 
Since 4.24, that command exits 3. Citrus then fails the test, and the 
integrations are left running.
   
   The fix is [CAMEL-27149](https://issues.apache.org/jira/browse/CAMEL-27149), 
apache/camel#30321. I'll rerun the tests here once it is in a published 
snapshot, and hold the merge until then.
   
   _Claude Code on behalf of Claus Ibsen_


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]

Reply via email to