https://issues.apache.org/jira/browse/CASSANDRA-15355?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Baker updated CASSANDRA-15355:
------------------------------------
     Bug Category: Parent values: Degradation(12984)Level 1 values: Slow Use 
Case(12996)
       Complexity: Low Hanging Fruit
    Discovered By: User Report
         Severity: Normal
           Status: Open  (was: Triage Needed)

> Schema push/pull race on continuous schema changes
> --------------------------------------------------
>
>                 Key: CASSANDRA-15355
>                 URL: https://issues.apache.org/jira/browse/CASSANDRA-15355
>             Project: Cassandra
>          Issue Type: Bug
>          Components: Cluster/Gossip
>            Reporter: James Baker
>            Priority: Normal
>              Labels: pull-request-available
>          Time Spent: 10m
>  Remaining Estimate: 0h
>
> In https://issues.apache.org/jira/browse/CASSANDRA-5025, pull based schema 
> updates were scheduled 1 minute after the schema change was first visible, so 
> as to prefer the push codepath as much as possible.
> Unfortunately, this does not handle the case where there are many schema 
> changes happening - imagine a scenario where we create a table every 5 
> seconds for 2 minutes - the first update tasks execute 60 seconds in and the 
> schemas may well be out of sync between nodes at that point.
> In this case, there is some chance that when the task runs, the schemas are 
> out of sync because a subsequent schema update has occurred, and so the same 
> push/pull race has happened.
> A fix is to modify the codepath such that the scheduled task is only run if 
> the other node's schema version is the same as when the task was scheduled. A 
> different (later scheduled) task should run otherwise.
> For us, what we see is that when we have a reasonably large number of 
> changes, a few schema changes can have the unfortunate outcome of causing our 
> nodes to run out of memory and crash - if we have a 30 node cluster, create a 
> table every second for 2 minutes, and for some reason we pause for 10 seconds 
> after 60 seconds with no progress, we can easily end up currently running 300 
> schema pulls for a single node. These can cause further piling up which 
> causes cascading failures. This change stops that.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

---------------------------------------------------------------------
To unsubscribe, e-mail: commits-unsubscr...@cassandra.apache.org
For additional commands, e-mail: commits-h...@cassandra.apache.org

Reply via email to