This is an automated email from the ASF dual-hosted git repository.
zky pushed a commit to branch main
in repository https://gitbox.apache.org/repos/asf/incubator-devlake-website.git
The following commit(s) were added to refs/heads/main by this push:
new 9302205435 fix: updated Transformations in Tutorial (#536)
9302205435 is described below
commit 930220543519dd4a43006936c6893c3685d7ba30
Author: Yumeng Wang <[email protected]>
AuthorDate: Thu May 18 18:36:25 2023 +0800
fix: updated Transformations in Tutorial (#536)
---
docs/Configuration/Tutorial.md | 6 ++++--
versioned_docs/version-v0.17/Configuration/Tutorial.md | 6 ++++--
2 files changed, 8 insertions(+), 4 deletions(-)
diff --git a/docs/Configuration/Tutorial.md b/docs/Configuration/Tutorial.md
index 1478881940..247d9ebd37 100644
--- a/docs/Configuration/Tutorial.md
+++ b/docs/Configuration/Tutorial.md
@@ -24,6 +24,8 @@ For either usage of the Blueprint, creating it consists of
four steps:
3. Adding Transformations (Optional): Add transformation rules for the data
scope you have selected in order to view corresponding metrics
4. Setting the Sync Policies: Set the sync frequency, time range and the
skip-on-fail option for your data
+For detailed instructions of each data source, please go to their individual
configuration docs from the sidebar.
+
### Step 1 - Add Data Connections
There are two ways to add data connections to your Blueprint: adding them
during the creation of a Blueprint and adding them separately on the Data
Integrations page. There is no difference between these two ways.
@@ -40,8 +42,8 @@ After adding data connections, click on "Next Step" and you
will be prompted to
### Step 3 - Add Transformations (Optional)
This step is required for viewing certain metrics (e.g. Bug Age, Bug Count per
1k Lines of Code and DORA)in the pre-built dashboards that require data
transformation. We highly recommend adding Transformations for your data for
the best display of the metrics. but you can still view the basic metrics if
you skip this step.
-
-
+
+
### Step 4 - Set the Sync Policies
Time Filter: You can select the time range of the data you wish to sync to
speed up the collection process.
diff --git a/versioned_docs/version-v0.17/Configuration/Tutorial.md
b/versioned_docs/version-v0.17/Configuration/Tutorial.md
index 1478881940..247d9ebd37 100644
--- a/versioned_docs/version-v0.17/Configuration/Tutorial.md
+++ b/versioned_docs/version-v0.17/Configuration/Tutorial.md
@@ -24,6 +24,8 @@ For either usage of the Blueprint, creating it consists of
four steps:
3. Adding Transformations (Optional): Add transformation rules for the data
scope you have selected in order to view corresponding metrics
4. Setting the Sync Policies: Set the sync frequency, time range and the
skip-on-fail option for your data
+For detailed instructions of each data source, please go to their individual
configuration docs from the sidebar.
+
### Step 1 - Add Data Connections
There are two ways to add data connections to your Blueprint: adding them
during the creation of a Blueprint and adding them separately on the Data
Integrations page. There is no difference between these two ways.
@@ -40,8 +42,8 @@ After adding data connections, click on "Next Step" and you
will be prompted to
### Step 3 - Add Transformations (Optional)
This step is required for viewing certain metrics (e.g. Bug Age, Bug Count per
1k Lines of Code and DORA)in the pre-built dashboards that require data
transformation. We highly recommend adding Transformations for your data for
the best display of the metrics. but you can still view the basic metrics if
you skip this step.
-
-
+
+
### Step 4 - Set the Sync Policies
Time Filter: You can select the time range of the data you wish to sync to
speed up the collection process.