This is an automated email from the ASF dual-hosted git repository. zhongjiajie pushed a commit to branch 3.0.4-prepare in repository https://gitbox.apache.org/repos/asf/dolphinscheduler.git
commit c6b9afe878a0546540f441329fa0e487557ef7a2 Author: longtb <[email protected]> AuthorDate: Sat Dec 10 12:23:44 2022 +0800 [fix-13041] fix example checkFormula (#13110) Co-authored-by: zhangshunmin <[email protected]> (cherry picked from commit 917df4f6ca9513f0d535f5c3b8ceb372a0ad9966) --- docs/docs/en/guide/data-quality.md | 4 ++-- docs/docs/zh/guide/data-quality.md | 12 ++++++------ 2 files changed, 8 insertions(+), 8 deletions(-) diff --git a/docs/docs/en/guide/data-quality.md b/docs/docs/en/guide/data-quality.md index ec308df3bb..0df3bbdcb7 100644 --- a/docs/docs/en/guide/data-quality.md +++ b/docs/docs/en/guide/data-quality.md @@ -33,8 +33,8 @@ data-quality.jar.name=dolphinscheduler-data-quality-dev-SNAPSHOT.jar | CheckFormula | <ul><li>Expected-Actual</li><li>Actual-Expected</li><li>(Actual/Expected)x100%</li><li>(Expected-Actual)/Expected x100%</li></ul> | | Operator | =, >, >=, <, <=, != | | ExpectedValue | <ul><li>FixValue</li><li>DailyAvg</li><li>WeeklyAvg</li><li>MonthlyAvg</li><li>Last7DayAvg</li><li>Last30DayAvg</li><li>SrcTableTotalRows</li><li>TargetTableTotalRows</li></ul> | -| Example |<ul><li>CheckFormula:Expected-Actual</li><li>Operator:></li><li>Threshold:0</li><li>ExpectedValue:FixValue=9</li></ul> - +| Example | <ul><li>CheckFormula:Actual-Expected</li><li>Operator:></li><li>Threshold:0</li><li>ExpectedValue:FixValue=9</li></ul> | + In the example, assuming that the actual value is 10, the operator is >, and the expected value is 9, then the result 10 -9 > 0 is true, which means that the row data in the empty column has exceeded the threshold, and the task is judged to fail. # Task Operation Guide diff --git a/docs/docs/zh/guide/data-quality.md b/docs/docs/zh/guide/data-quality.md index 50e2c92f14..718efc2352 100644 --- a/docs/docs/zh/guide/data-quality.md +++ b/docs/docs/zh/guide/data-quality.md @@ -44,12 +44,12 @@ data-quality.jar.name=dolphinscheduler-data-quality-dev-SNAPSHOT.jar - 目标表总行数 - 例子 - - 校验方式为:[Expected-Actual][期望值-实际值] - - [操作符]:> - - [阈值]:0 - - 期望值类型:固定值=9。 - - 假设实际值为10,操作符为 >, 期望值为9,那么结果 10 -9 > 0 为真,那就意味列为空的行数据已经超过阈值,任务被判定为失败 + - 校验方式为:[Actual-Expected][实际值-期望值] + - [操作符]:> + - [阈值]:0 + - 期望值类型:固定值=9。 + + 假设实际值为10,操作符为 >, 期望值为9,那么结果 10 -9 > 0 为真,那就意味列为空的行数据已经超过阈值,任务被判定为失败 # 任务操作指南 ## 单表检查之空值检查
