This is an automated email from the ASF dual-hosted git repository.
abaker pushed a commit to branch develop
in repository https://gitbox.apache.org/repos/asf/geode.git
The following commit(s) were added to refs/heads/develop by this push:
new 2310edf Reset CI job timeouts until PR pipeline is faster
2310edf is described below
commit 2310edf4efa48151f97001871c5df49e1a8cf5d5
Author: Anthony Baker <[email protected]>
AuthorDate: Thu Jul 26 13:25:55 2018 -0700
Reset CI job timeouts until PR pipeline is faster
---
ci/pipelines/geode-build/test-stubs/distributed.yml | 4 ++--
ci/pipelines/geode-build/test-stubs/integration.yml | 4 ++--
2 files changed, 4 insertions(+), 4 deletions(-)
diff --git a/ci/pipelines/geode-build/test-stubs/distributed.yml
b/ci/pipelines/geode-build/test-stubs/distributed.yml
index fb76b46..e2aafc8 100644
--- a/ci/pipelines/geode-build/test-stubs/distributed.yml
+++ b/ci/pipelines/geode-build/test-stubs/distributed.yml
@@ -27,6 +27,6 @@ metadata:
# specified in Gigabytes.
ram: 210
# specified in seconds
- call_stack_timeout: 5400
- timeout: 2h
+ call_stack_timeout: 25200
+ timeout: 8h
size: []
diff --git a/ci/pipelines/geode-build/test-stubs/integration.yml
b/ci/pipelines/geode-build/test-stubs/integration.yml
index df921a4..e2a4282 100644
--- a/ci/pipelines/geode-build/test-stubs/integration.yml
+++ b/ci/pipelines/geode-build/test-stubs/integration.yml
@@ -26,6 +26,6 @@ metadata:
# specified in Gigabytes.
ram: 30
# specified in seconds
- call_stack_timeout: 7200
- timeout: 3h
+ call_stack_timeout: 25200
+ timeout: 8h
size: []