[ 
https://issues.apache.org/jira/browse/HUDI-203?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

vinoyang closed HUDI-203.
-------------------------
    Resolution: Implemented

> Improve Unit Test Quality in Hudi 
> ----------------------------------
>
>                 Key: HUDI-203
>                 URL: https://issues.apache.org/jira/browse/HUDI-203
>             Project: Apache Hudi (incubating)
>          Issue Type: Improvement
>          Components: Testing
>            Reporter: Balaji Varadarajan
>            Assignee: vinoyang
>            Priority: Minor
>
> Historically, We had been  tackling a CI problem - Tests taking too long to 
> finish and timing out. We had mitigated this by eliminating redundant tests. 
> and are introducing parallel jobs feature of travis 
> ([https://docs.travis-ci.com/user/speeding-up-the-build/#parallelizing-your-builds-across-virtual-machines])
>  to have both unit and integration tests run in parallel. We realized that 
> the unit-tests themselves needs to be refactored holistically. We would need 
> to do a better job in standardizing the test setup utility functions and 
> abstractions.  Also, some tests have huge setup costs but they don't need the 
> entire setup.  This ticket is for tracking this effort.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to