[ 
https://issues.apache.org/jira/browse/HUDI-6265?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Ethan Guo updated HUDI-6265:
----------------------------
    Priority: Critical  (was: Major)

> Fix timeline check for meta sync
> --------------------------------
>
>                 Key: HUDI-6265
>                 URL: https://issues.apache.org/jira/browse/HUDI-6265
>             Project: Apache Hudi
>          Issue Type: Bug
>    Affects Versions: 0.13.0
>            Reporter: Ethan Guo
>            Assignee: Ethan Guo
>            Priority: Critical
>             Fix For: 0.14.0
>
>
> [https://github.com/apache/hudi/pull/7561/files#r1203654251]
> The following case where the timeline is like:
> {code:java}
> ts3.rollback, ts50.commit, ts51.commit, ts52.commit, ...{code}
> and ts49.commit and ts48.commit are archived.
> If we pass in ts47 as the exclusiveStartInstantTime at this point, 
> activeTimeline.isBeforeTimelineStarts(exclusiveStartInstantTime) returns 
> false. However, the active timeline misses ts48.commit and ts49.commit which 
> are required for meta sync. This is a problem if ts48.commit or ts49.commit 
> has partition changes.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to