[ 
https://issues.apache.org/jira/browse/HUDI-6389?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

ASF GitHub Bot updated HUDI-6389:
---------------------------------
    Labels: pull-request-available  (was: )

> Fix instant time check against the active timeline in meta sync
> ---------------------------------------------------------------
>
>                 Key: HUDI-6389
>                 URL: https://issues.apache.org/jira/browse/HUDI-6389
>             Project: Apache Hudi
>          Issue Type: Bug
>            Reporter: Ethan Guo
>            Assignee: Ethan Guo
>            Priority: Blocker
>              Labels: pull-request-available
>             Fix For: 0.14.0
>
>
> [https://github.com/apache/hudi/pull/7561/files/f61d9480f00b3f79d71044e0392ed6e2f10af4ad#r1203654251]
>  
> the following case where the timeline is like:
> ts3.rollback, ts50.commit, ts51.commit, ts52.commit, ...
> and ts49.commit and ts48.commit are archived.
> If we pass in ts47 as the exclusiveStartInstantTime at this point, 
> activeTimeline.isBeforeTimelineStarts(exclusiveStartInstantTime) returns 
> false. However, the active timeline misses ts48.commit and ts49.commit which 
> are required for meta sync. This is a problem if ts48.commit or ts49.commit 
> has partition changes.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to