Vinoth Chandar created HUDI-8562:
------------------------------------
Summary: Move requesting and time generation calls under a single
lock step
Key: HUDI-8562
URL: https://issues.apache.org/jira/browse/HUDI-8562
Project: Apache Hudi
Issue Type: Improvement
Reporter: Y Ethan Guo
Assignee: Vinoth Chandar
Fix For: 1.0.0
For serializability and strict time ordering, we should provide Spanner's
TrueTime guarantee, i.e., lock and wait for a time period considering the
practical largest clock skew (e.g., 500ms) before generating a new time, so
that the time generated is always monotonically increasing for both instant
time and completion time.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)