btashton commented on PR #8452:
URL: https://github.com/apache/nuttx/pull/8452#issuecomment-1421045563

   > @xiaoxiang781216 after reviewing PR #8454 I started thinking about this 
idea: include an automatic "Before and After binary size increment" on our CI. 
This way we don't need to ask people to verify how much that patch increased 
NuttX size. What do you think? Any idea how to do that? Maybe @btashton has 
some suggest he knows a lot about this CI logic.
   
   I did start building something like this a while back, but was only going to 
do it on master where getting the baseline is much easier. I already set CI up 
to generate an artifact with the build outputs from all the builds with the 
intention of being able to compare this data. 
   
   I started building something here 
   https://github.com/btashton/nuttx-testnom


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]

Reply via email to