DanielLeens commented on issue #7937:
URL: https://github.com/apache/seatunnel/issues/7937#issuecomment-5083372188

   Draft implementation spike opened: #11559
   
   This PR implements only the **Phase-0 / M0 terminal planning and 
deployment-descriptor slice** of the proposal above. It is deliberately 
non-deployable and non-runnable, and both physical-plan initialization and 
direct start fail before any source or lookup task can run.
   
   It must not be treated as PR-1 complete or merge-ready. The remaining 
completion gates are:
   
   1. real exchange, barrier, state, restore/gate, bootstrap, output, and 
lookup row semantics;
   2. scheduler-owned deployment-attempt identity plus transport fencing;
   3. mixed-version JobMaster/Worker capability handshake;
   4. the full Gate A multi-channel, different-parallelism, legacy-regression, 
deployment, and checkpoint runtime matrix.
   
   The Draft body records the exact static validation performed and the local 
compile/test/E2E evidence that is still absent.


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]

Reply via email to