davidzollo commented on PR #11928:
URL: https://github.com/apache/seatunnel/pull/11928#issuecomment-5579238755

   This branch was 67 commits behind `dev` and its last `Build` run had been 
stuck `in_progress` for about a week (run 33521615794, started 2026-09-01) with 
only an unrelated `Dead links` failure 
(`https://research.google/pubs/pub43438/` returning a transient 500) actually 
completed — nothing about this PR's own change. Merged current `dev` 
(`8bea8c681ca`) into this branch and pushed `4c51cb31919`; that's a clean merge 
with zero touches to `ParquetWriteStrategy.java` or its test, and triggers a 
fresh `Build` run (`34187142529`) from scratch instead of relying on the stuck 
one.
   
   `./mvnw spotless:apply` run on `connector-file-base` after the merge, no 
formatting changes produced.
   


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]

Reply via email to