davidzollo commented on PR #12149:
URL: https://github.com/apache/seatunnel/pull/12149#issuecomment-6393979373

   Updated this PR against current dev and completed the scheduler lifecycle 
follow-up in 0e6768c328d59c4b0e9bc9c214d9c6d746e971ce. Trigger scheduling keeps 
both terminal-shutdown rejection handling and dev's propagation of asynchronous 
trigger errors; the checkpoint-timeout watchdog now also records a late 
terminal-shutdown rejection. Both new lifecycle unit tests always cancel their 
coordinator during cleanup. The existing real master-failover IT still proves 
checkpoints progress after recovery and now checks the exact recovered 
coordinator's scheduler is shut down after cancellation, before server shutdown 
can hide it. Scoped Spotless and diff checks passed. Runtime validation remains 
pending on this final head; no merge or production approval is implied.


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]

Reply via email to