[
https://issues.apache.org/jira/browse/HADOOP-5628?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Allen Wittenauer resolved HADOOP-5628.
--------------------------------------
Resolution: Invalid
Closing this as stale.
test-patch.sh is now very smart about what it does. The problem is now that a
lot of the tests are out of control in how long they run (hadoop-hdfs, for
example, is usually 2 hours on its own...)
> Create target for 10 minute patch test build
> --------------------------------------------
>
> Key: HADOOP-5628
> URL: https://issues.apache.org/jira/browse/HADOOP-5628
> Project: Hadoop Common
> Issue Type: Bug
> Components: test
> Reporter: Owen O'Malley
>
> I think we should create an ant target that performs a smoke test on the
> patched system to enable developers to have faster turn around time on
> developing patches than the 3 hour unit tests that we currently have.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)