[
https://issues.apache.org/jira/browse/HADOOP-5170?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12726753#action_12726753
]
Matei Zaharia commented on HADOOP-5170:
---------------------------------------
Jonathan, would you be okay if this feature was placed in the fair scheduler?
I agree with Owen that it's a good idea to remove task limits from the Hadoop
core interface so as not to lock in the API. However, I will support them in
the fair scheduler. Apart from the demand for this feature from the community,
we have paying customers at Cloudera who asked for this patch and run it on
multi-rack clusters.
> Set max map/reduce tasks on a per-job basis, either per-node or cluster-wide
> ----------------------------------------------------------------------------
>
> Key: HADOOP-5170
> URL: https://issues.apache.org/jira/browse/HADOOP-5170
> Project: Hadoop Common
> Issue Type: New Feature
> Components: mapred
> Reporter: Jonathan Gray
> Assignee: Matei Zaharia
> Fix For: 0.21.0
>
> Attachments: HADOOP-5170-tasklimits-v3-0.18.3.patch,
> tasklimits-v2.patch, tasklimits-v3-0.19.patch, tasklimits-v3.patch,
> tasklimits-v4-20.patch, tasklimits-v4.patch, tasklimits.patch
>
>
> There are a number of use cases for being able to do this. The focus of this
> jira should be on finding what would be the simplest to implement that would
> satisfy the most use cases.
> This could be implemented as either a per-node maximum or a cluster-wide
> maximum. It seems that for most uses, the former is preferable however
> either would fulfill the requirements of this jira.
> Some of the reasons for allowing this feature (mine and from others on list):
> - I have some very large CPU-bound jobs. I am forced to keep the max
> map/node limit at 2 or 3 (on a 4 core node) so that I do not starve the
> Datanode and Regionserver. I have other jobs that are network latency bound
> and would like to be able to run high numbers of them concurrently on each
> node. Though I can thread some jobs, there are some use cases that are
> difficult to thread (scanning from hbase) and there's significant complexity
> added to the job rather than letting hadoop handle the concurrency.
> - Poor assignment of tasks to nodes creates some situations where you have
> multiple reducers on a single node but other nodes that received none. A
> limit of 1 reducer per node for that job would prevent that from happening.
> (only works with per-node limit)
> - Poor mans MR job virtualization. Since we can limit a jobs resources, this
> gives much more control in allocating and dividing up resources of a large
> cluster. (makes most sense w/ cluster-wide limit)
--
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.