[
https://issues.apache.org/jira/browse/HADOOP-19235?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Xiaoqiao He updated HADOOP-19235:
---------------------------------
Fix Version/s: HDFS-17531
(was: 3.5.0)
> IPC client uses CompletableFuture to support asynchronous operations.
> ---------------------------------------------------------------------
>
> Key: HADOOP-19235
> URL: https://issues.apache.org/jira/browse/HADOOP-19235
> Project: Hadoop Common
> Issue Type: New Feature
> Components: common
> Reporter: Jian Zhang
> Assignee: Jian Zhang
> Priority: Major
> Labels: pull-request-available
> Fix For: HDFS-17531
>
> Attachments: HADOOP-19235.patch
>
>
> h3. Description
> In the implementation of asynchronous Ipc.client, the main methods used
> include HADOOP-13226, HDFS-10224, etc.
> However, the existing implementation does not support `CompletableFuture`;
> instead, it relies on setting up callbacks, which can lead to the "callback
> hell" problem. Using `CompletableFuture` can better organize asynchronous
> callbacks. Therefore, on the basis of the existing implementation, by using
> `CompletableFuture`, once the `client.call` is completed, the asynchronous
> thread handles the response of this call without blocking the main thread.
>
> *Test*
> new UT TestAsyncIPC#testAsyncCallWithCompletableFuture()
--
This message was sent by Atlassian Jira
(v8.20.10#820010)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]