Also, it seems that plan was to fix there before hand.

V.


James Turner wrote:
> Hi all,
>    Validator should have a release before packages likes Struts make 
> releases based on it.  Therefore I am proposing to do a 1.0 release on 1 
> November, and volunteering to release manage it.
> 
>    There are at present very few bugs against Validator (6), some of 
> which are either already closeable or could be fixed with little 
> effort.  However, I am about to release a near-complete rewrite of the 
> core Validator methods (following the consensus of the previous vote on 
> that matter), and want to give the new code some time to settle in and 
> be tested before freeze.
> 
>    The proposed schedule is:
> 
> 1 October - Feature freeze for Validator 1.0
> 15 October - Code freeze for Validator 1.0
> 1 November - Final Release Build
> 
> The current outstanding bugs to fix in Validator before release are:
> 7318  javascript: zero - means bad integer??
> 7349  Date Validation passes invalid date
> 8787  Indexed field validation patch
> 10584 Not all validation files are read in Validation PlugIn
> 10780  A few refactorings to Validator.java
> 10782  If two fields are required, and one has a mask, the mask is
> 
> Please vote as follows:
> 
> +1: I'm in favor of a Validator 1.0 release according to the schedule 
> outlined
> 
> 0: Like I care?
> 
> -1: I have an objection either to the schedule, the release, or the 
> choice of release manager (please specify)
> 
> 3.1415926: I am an irrational person
> 
> James




--