Dear colleagues,

Following the earlier discussions on Public ENUM under e164.arpa, I have
prepared the following draft liaison statement for the September 2026 ITU-T
Study Group 2 meeting.

In my draft I tried to:
- clarify the RIPE NCC’s position following SG2-C-0196*,
- support the confirmation of the revised interim procedures**,
- outline how the responses to TSB Circular 123*** could inform the
treatment of individual delegations,
- and provide an updated overview of the operational status of the current
delegations.

I would appreciate feedback on my draft and I would appreciate it if you
could share any comments or concerns, particularly on the technical,
procedural or governance aspects, by 25 August, so that the RIPE NCC can
incorporate the feedback before finalizing the submission.

Many thanks in advance for your review.

Regards,
Hisham

* https://www.ripe.net/media/documents/ENUM_liaison_statement_ITU_T_SG2.pdf
** https://www.itu.int/en/ITU-T/inr/enum/Pages/procedures.aspx
*** https://www.itu.int/md/T25-TSB-CIR-0123/en

To:
ITU-T Study Group 2, September 2026 Meeting

Title:
RIPE NCC liaison statement on ENUM (e164.arpa)

Dear colleagues,

The RIPE NCC thanks ITU-T Study Group 2, the Telecommunication
Standardization Bureau, the Internet Architecture Board, Member States and
ENUM delegation operators for their continued engagement concerning Public
ENUM under e164.arpa.

The RIPE NCC operates the e164.arpa zone as the IAB’s designated operator
under the established coordination arrangements involving the IAB, ITU-T
and the RIPE NCC.

1. RIPE NCC position

At the February 2026 meeting of Study Group 2, the RIPE NCC submitted
contribution SG2-C-0196. The contribution arose from an operational
question concerning support for ENUM domain objects through the
Registration Data Access Protocol, but also raised broader questions
concerning the future status of ENUM and e164.arpa.

Following subsequent engagement with the IAB, ENUM delegation operators and
members of the RIPE community, the RIPE NCC recognizes that those broader
questions did not accurately reflect the established distribution of
responsibilities. This statement therefore clarifies and supersedes the
relevant parts of SG2-C-0196.

For the avoidance of doubt, the RIPE NCC supports the continued operation
of Public ENUM under e164.arpa and is not proposing its closure. SG2-C-0196
no longer represents a request for Study Group 2 to determine the technical
or architectural future of ENUM or e164.arpa.

Any future consideration of a system-wide change would require coordination
involving the IAB, the relevant IETF and ITU-T processes, the RIPE NCC and
affected stakeholders.

2. Operational status and revised procedures

The RIPE NCC has reviewed the 46 current delegations recorded in the RIPE
Database. Of these, 23 showed no DNS issue at the top delegation level, 17
appeared non-operational and six showed partial DNS issues.

These findings identify a registry-maintenance and data-accuracy issue.
They do not provide a sufficient basis for a system-wide conclusion
concerning Public ENUM or e164.arpa.

The RIPE NCC therefore welcomes the revised Interim procedures for
Geographic Country Codes (ENUM administration ad interim) contained in
TD423 Rev.1/PLEN. The revised procedures provide an appropriate mechanism
for addressing individual non-operational or expired temporary delegations
while preserving functioning delegations and the ability of Member States
to confirm, update, withdraw or subsequently restore their delegations.

Responses to TSB Circular 123 may provide useful information concerning the
status and intentions of individual national delegations. The RIPE NCC
considers that such information should inform individual cases under the
revised procedures, rather than a system-wide conclusion concerning Public
ENUM or e164.arpa.

3. Request to Study Group 2

The RIPE NCC respectfully invites Study Group 2 to:

   - confirm that the revised procedures contained in TD423 Rev.1/PLEN will
   come into force at the September 2026 meeting and will provide the
   applicable mechanism for addressing individual non-operational or expired
   temporary delegations; and
   - continue coordination with the IAB, the RIPE NCC, the relevant IETF
   processes and affected stakeholders on any broader questions concerning the
   technical or long-term status of ENUM and e164.arpa.

Once the revised procedures come into force, the RIPE NCC intends to apply
them systematically and transparently, including by refreshing its
technical assessment, engaging with relevant delegation operators where
possible and submitting substantiated cases to TSB.

The question of Registration Data Access Protocol support is separate from
the continued operation of Public ENUM and will be considered through the
appropriate technical and community processes.

The RIPE NCC remains committed to working constructively with Study Group
2, TSB, the IAB, Member States, delegation operators and the RIPE community
to maintain e164.arpa in a stable, accurate and technically sound manner.
-----
To unsubscribe from this mailing list or change your subscription options, 
please visit: https://mailman.ripe.net/mailman3/lists/cooperation-wg.ripe.net/
As we have migrated to Mailman 3, you will need to create an account with the 
email matching your subscription before you can change your settings. 
More details at: https://www.ripe.net/membership/mail/mailman-3-migration/

Reply via email to