[ 
https://issues.apache.org/jira/browse/HADOOP-2801?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Sameer Paranjpye updated HADOOP-2801:
-------------------------------------

    Fix Version/s:     (was: 0.16.1)
                   0.17.0
         Assignee: Amar Kamat

> Non-speculative and speculative tasks for a TIP start at the same time.
> -----------------------------------------------------------------------
>
>                 Key: HADOOP-2801
>                 URL: https://issues.apache.org/jira/browse/HADOOP-2801
>             Project: Hadoop Core
>          Issue Type: Bug
>          Components: mapred
>            Reporter: Amar Kamat
>            Assignee: Amar Kamat
>             Fix For: 0.17.0
>
>
> I ran into a situation where the non-speculative task and the speculative 
> task were started at the same time. Ideally there should be a 1 min gap for 
> speculation. One possible reason would be the usage of {{startTime}} in 
> deciding whether there is a speculative lag.

-- 
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.

Reply via email to