Fix speculative execution or allow premature stop
-------------------------------------------------
Key: HADOOP-3632
URL: https://issues.apache.org/jira/browse/HADOOP-3632
Project: Hadoop Core
Issue Type: New Feature
Affects Versions: 0.16.3
Reporter: Severin Hacker
I run 50 iterations of a program with 500 maps and no reduces. I have noticed
the following behaviour:
In 50% of the iterations:
499 maps finish in 50 seconds
1 map finishes after 4 minutes
Total time is 4 minutes.
In 50% of the iterations:
500 maps finish in 50 seconds
Total time is 50 seconds.
It would be nice if I could tell hadoop to stop after 99% of the maps have
finished (and not wait for that last straggler). In my application it's
perfectly fine if I only get 99% of the results, as long as the straggler is
not always using the same data.
Please fix!
--
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.