[
https://issues.apache.org/jira/browse/HADOOP-5895?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Ravi Gummadi updated HADOOP-5895:
---------------------------------
Attachment: HADOOP-5895.v1.patch
Agreed Jothi.
Here is the patch with a flag doing the work of considering final merge as part
of calculation of estimated input bytes of merges.
> Log message shows -ve number of bytes to be merged in the final merge pass
> when there are no intermediate merges and merge factor is > number of segments
> ---------------------------------------------------------------------------------------------------------------------------------------------------------
>
> Key: HADOOP-5895
> URL: https://issues.apache.org/jira/browse/HADOOP-5895
> Project: Hadoop Core
> Issue Type: Bug
> Reporter: Ravi Gummadi
> Assignee: Ravi Gummadi
> Fix For: 0.21.0
>
> Attachments: HADOOP-5895.patch, HADOOP-5895.v1.patch
>
>
> Log message shows -ve number of bytes to be merged in the final merge pass
> when there are no intermediate merges and the mergeFactor is > total number
> of segments to be merged. This issue is because of code changes done in
> HADOOP-5572.
--
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.