Hi


Hope you are doing well.



My name is Gagan from Elegant Solutions. I have a job located in* Sacramento
CA*. Client is looking for* IT Project Oversight Services/Senior Technical
Specialist/Lead  *and the detailed description of the job is mentioned
below.

If you are interested in this role, please reply back with updated resume
and following information:-



Full Legal Name:
Email id:
Phone Number:
Current Loc:

Relocation:
Visa Status:

Expiry Date:

Availability to join:

Availability for Interview:

Academic Qualification:

*(Including University name and Year of Completion)*

Three Professional References:

*(Name/Title/Company/Contact/Email)*

Total IT Experience:

Relevant Experience:

Experience in US:



*Position: IT Project Oversight Services/Senior Technical Specialist/Lead*

*Duration: 7 Months*

*Loc: Sacramento CA*



*PROJECT SCOPE/TASKS*

The scope of this project may encompass, but is not limited to, the
following tasks:



*1. Functional Optimization (FO) Software Development Life Cycle (SDLC)
Practices Review*

Independent review of the Functional Optimization (FO) project’s adherence
to the CalPERS Enterprise Solutions Development Division (ESDD) established
SDLC methodologies, practices, processes, and procedures that includes the
degree to which they are applied correctly, efficiently, consistently, and
diligently and produce intended results. Processes for the review to
include, but not limited to:

• Pre-analysis activities

• Requirements Analysis activities

• Design activities

• Development activities

• Test activities

• Release Planning, Management and Deployment



*2. Functional Optimization (FO) Project Management Practices Review*

Independent review of the FO project’s adherence to formalized project
management processes and the degree to which processes are applied
correctly, efficiently, consistently, and diligently and produce intended
results. Processes for the review to include, but not limited to:

• Project Planning and Tracking (Monitoring and Controlling) processes

• Governance, Risk and Issue Management

• Change Management

• Communications Management and Status Reporting

• Scope Management

• Schedule Management

• Budget Management

• Quality Management (Planning, Control, Assurance, and Improvement)

• Human Resources Management



*3. Functional Optimization (FO) Observations, Findings, and
Recommendations*

Development of observations, findings, and recommended actions for all
areas covered under the SDLC and Project Management reviews in terms of the
degree and manner in which methodologies and processes are adhered to and
applied correctly, efficiently, consistently, diligently, and produce
intended results.



*4. IT Project Oversight Framework Development*

Evaluation of IT project oversight methodologies and practices in use
currently at CalPERS and development of a formal IT Project Oversight
Framework and processes. Activities to include, but not limited to
development or modification of:

• IT Project Oversight overall Framework (with graphical and narrative
descriptions)

• Project rating system with minimum required project management and
governance practices

• Criteria and methodology to determine the level and type of IT project
oversight

• Process flow for determination of level and type of IT project oversight
recommended for projects

• IT project oversight reporting, governance and communication requirements

• IT Project Health Indicator methodology, and related governance, and risk
practices

Note: Full IT Project Oversight methodology and processes to support the
framework will be developed as time and resources permit, once foundational
components are completed.

For all of these activities, the IT Project Oversight Services
consultant(s) should coordinate and communicate with appropriate
stakeholders



*1.1      Requirements Management *

*RM-1 Evaluate and make recommendations on the project’s adherence
Management to processes and procedures for managing requirements.*

*RM-2 Verify that system requirements are well-defined, understood and
Management documented.*

*RM-3 Verify that software requirements can be traced through design,
Management code and test phases to verify that the system performs as
intended and contains no unnecessary software elements.*

*RM-4 Verify that requirements are placed under formal configuration
Management control.*

*RM-5 Verify that performance requirements (e.g. timing, response time
Analysis and throughput) satisfy user needs*



*1.2      Software Development *

*SD-1 Evaluate the team’s adherence to established processes in the Design
development of functional and technical designs.*

*Detailed*

*SD-2 Verify that design requirements can be traced back to system Design
requirements and high level design as per established processes.*

*SD-3 Evaluate code documentation for adherence to quality, completeness
(including maintenance history) and accessibility standards and
practices.Unit Test*

*SD-4 Evaluate the plans, requirements, environment, tools, and procedures
used for unit testing system modules.Unit Test*

*SD-5 Verify that an appropriate level of test coverage is planned and
achieved by the test process and that test results are verified.*



*1.3      Data Management *

*DM-1 Evaluate the project’s existing and proposed plans, procedures and
Availability software for data availability for testing.*

*DM-2 Verify that procedures are in place and are being followed to review
Accuracy test data for completeness and accuracy.Data*

*DM-3 Evaluate data conversion requirements, processes, and accuracy
Conversion practices.*



*1.4      System And Acceptance Testing *

*ST- 1 Verify that an appropriate testing strategy is available*



*Gagandeep Purba*

Direct:    *410 800 4305*

Fax:         *703-722-6628*

Email:     [email protected]

*Elegant Enterprise-Wide Solutions, Inc *

We Participate in E-Verify

An SBA 8(a), ISO 9001:2008 Company

*Prime on GSA Schedule 70, 8(a) STARS II, eFAST, Seaport-e & many
State/Local Contracts *http://www.elegantsolutions.us

-- 
You received this message because you are subscribed to the Google Groups 
"CorptoCorp" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at https://groups.google.com/group/corptocorp.
For more options, visit https://groups.google.com/d/optout.

Reply via email to