Hi,
 
    After upgrading CalZope, CalCore and CPSSharedCalendar to svn versions I'm having some problems with the calendar portlet.
    I've created a slot in the theme to show all visible calendar events. This was working fine before I upgraded to SVN versions.
    If I create a new CPS instance, with these new CPS products, everything works fine, that is, the portlet works without problem.
    But in the old instance, running CPS 3.4.2, some things doesn't work:
    - Calendar portlet, as mentioned above;
    - Importing a iCalendar file - it works fine on the new CPS instance, created after I upgraded some products.
   
    Could someone help me on this?
    BTW, even though I have CPS-3.4.2 installed, my portal_setup tells me I'm running CPS-3.4.0 and there is no upgrade left to be done.

    Best regards,

--
Mario O.de Menezes, Ph.D.     "Many are the plans in a man's heart, but
LinuxUser: #24626         is the Lord's purpose that prevails" Pv 19.21
                        http://www.ipen.br/~mario
_______________________________________________
cps-devel mailing list
http://lists.nuxeo.com/mailman/listinfo/cps-devel

Reply via email to