After upgrading CalZope, CalCore and CPSSharedCalendar to svn versions I'm having some problems with the calendar portlet.
I've created a slot in the theme to show all visible calendar events. This was working fine before I upgraded to SVN versions.
If I create a new CPS instance, with these new CPS products, everything works fine, that is, the portlet works without problem.
But in the old instance, running CPS 3.4.2, some things doesn't work:
- Calendar portlet, as mentioned above;
- Importing a iCalendar file - it works fine on the new CPS instance, created after I upgraded some products.
Could someone help me on this?
BTW, even though I have CPS-3.4.2 installed, my portal_setup tells me I'm running CPS-3.4.0 and there is no upgrade left to be done.
Best regards,
--
Mario O.de Menezes, Ph.D. "Many are the plans in a man's heart, but
LinuxUser: #24626 is the Lord's purpose that prevails" Pv 19.21
http://www.ipen.br/~mario
_______________________________________________ cps-devel mailing list http://lists.nuxeo.com/mailman/listinfo/cps-devel
