I have flipped the switch to make Juno M7 available at

http://download.eclipse.org/releases/juno

The EPP Package downloads will be ready soon, later today, if not already
by the time you read this.


So, the end-game begins ... RC1 is due in 2 short weeks, and then, after
that, only one week between the remaining few RCs.

Thanks everyone,
_______________________________________________
cross-project-issues-dev mailing list
[email protected]
https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev

Reply via email to