I have flipped the switch to make Juno M7 available at
http://download.eclipse.org/releases/juno The EPP Package downloads will be ready soon, later today, if not already by the time you read this. So, the end-game begins ... RC1 is due in 2 short weeks, and then, after that, only one week between the remaining few RCs. Thanks everyone,
_______________________________________________ cross-project-issues-dev mailing list [email protected] https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev
