As there haven't been any changes to the GEF 3.9 maintenance branch since our 
3.9.1 (Kepler SR1) release, I would actually like to reuse that 3.9.1 release 
as part of the Kepler SR2 (if nothing comes up during the RC phase). Is there 
anything special to consider?

Cheers
Alexander
--
Dr. Alexander Nyßen
Dipl.-Inform.
Software-Engineer

Telefon: +49 (0) 231 / 98 60-210
Telefax: +49 (0) 231 / 98 60-211
Mobil: +49 (0) 151 /  17396743

http://www.itemis.de 
[email protected] 

itemis AG
Am Brambusch 15-24
44536 Lünen

Rechtlicher Hinweis:

Amtsgericht Dortmund, HRB 20621

Vorstand: Jens Wagener (Vors.), Wolfgang Neuhaus, Dr. Georg Pietrek, Jens 
Trompeter, Sebastian Neus

Aufsichtsrat: Dr. Burkhard Igel (Vors.), Stephan Grollmann, Michael Neuhaus


Attachment: signature.asc
Description: Message signed with OpenPGP using GPGMail

_______________________________________________
cross-project-issues-dev mailing list
[email protected]
https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev

Reply via email to