Hi Wayne,
ECF expects to contribute a version 3.14.5 [1] next week.
Scott
[1] https://projects.eclipse.org/projects/rt.ecf/releases/3.14.5
On 5/8/2019 1:04 PM, Wayne Beaton wrote:
Greetings Simultaneous Release 2019-06 participants.
Per our process, I have started to assemble the participants list for
2019-06 <https://projects.eclipse.org/releases/2019-06>.
By way of reminder, the process requires
<https://wiki.eclipse.org/SimRel/Simultaneous_Release_Requirements#State_intent_early>
that project teams signal their participation by making a change to
their aggrcon file in the simrel repository. For project teams that
intend to drop out of the simultaneous release, the process requires
that you inform the group and then remove your aggrcon file.
For projects that did participate in the previous simultaneous
release, the project team's representative must touch the
project's aggrcon file by the milestone 2 (M2) date of the release
to indicate that the project wishes to continue participating and
that they project team is paying attention.
AFAICT, 49 project teams have changed their aggrcon file since the
start of this release cycle. I have captured my best guess at the
version that each project is participating with. Please have a look
and let me know what I've gotten wrong.
Note that if you are adding a new version of your content (major,
minor, or service), you need to create a release record. Make sure
that your release record has "2019-06-19" as the release date (I did
notice that least one existing release record showed 2019-06-20 as the
release date; please have a look and fix your record if this is you).
Please create the release record (or ensure that it has been created)
before you tell me that I've listed the wrong version.
Version names must include some form of a semantic version. You can
prefix or suffix version names as you'd like. The convention appears
to be to not prefix or suffix, or to include the simultaneous release
name as a suffix.
Note that the PMI doesn't handle numbers appearing before the semantic
version very well, but I have a fix in the queue that should sort this
out in time for the release.
I intend to do a pass over the simrel repository again on Friday, May
10 (M2) to bring the participation list up to date and will start the
public shaming of those who have not followed the rules sometime
thereafter.
Per the December 2018 update to the EDP, project teams are not
required to engage in a release review if they've engaged in one in
the year leading up to their release date. No review is required. No
PMC approval is required. No IP log review is required. /Remember that
whether or not you engage in a review, project teams are required to
follow the Eclipse IP Due Diligence Process. Your releases must only
include IP that has been either "license certified" or "approved" by
the IP Team. /I will initiate a scan of the repository tonight to
ensure that unvetted IP has not been inadvertently added.
Thanks for your attention.
Wayne
--
Wayne Beaton
Director of Open Source Projects | Eclipse Foundation, Inc.
_______________________________________________
cross-project-issues-dev mailing list
cross-project-issues-dev@eclipse.org
To change your delivery options, retrieve your password, or unsubscribe from
this list, visit
https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
_______________________________________________
cross-project-issues-dev mailing list
cross-project-issues-dev@eclipse.org
To change your delivery options, retrieve your password, or unsubscribe from
this list, visit
https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev