hi wayne, mwe is 2.10.0 ~Christian

Am 08.05.19 um 22:04 schrieb Wayne Beaton:
> Greetings Simultaneous Release 2019-06 participants.
>
> Per our process, I have started to assemble the participants list for
> 2019-06 <https://projects.eclipse.org/releases/2019-06>.
>
> By way of reminder, the process requires
> <https://wiki.eclipse.org/SimRel/Simultaneous_Release_Requirements#State_intent_early>
> that project teams signal their participation by making a change to
> their aggrcon file in the simrel repository. For project teams that
> intend to drop out of the simultaneous release, the process requires
> that you inform the group and then remove your aggrcon file.
>
>     For projects that did participate in the previous simultaneous
>     release, the project team's representative must touch the
>     project's aggrcon file by the milestone 2 (M2) date of the release
>     to indicate that the project wishes to continue participating and
>     that they project team is paying attention.
>
>
> AFAICT, 49 project teams have changed their aggrcon file since the
> start of this release cycle. I have captured my best guess at the
> version that each project is participating with. Please have a look
> and let me know what I've gotten wrong.
>
> Note that if you are adding a new version of your content (major,
> minor, or service), you need to create a release record. Make sure
> that your release record has "2019-06-19" as the release date (I did
> notice that least one existing release record showed 2019-06-20 as the
> release date; please have a look and fix your record if this is you).
>
> Please create the release record (or ensure that it has been created)
> before you tell me that I've listed the wrong version.
>
> Version names must include some form of a semantic version. You can
> prefix or suffix version names as you'd like. The convention appears
> to be to not prefix or suffix, or to include the simultaneous release
> name as a suffix.
>
> Note that the PMI doesn't handle numbers appearing before the semantic
> version very well, but I have a fix in the queue that should sort this
> out in time for the release.
>
> I intend to do a pass over the simrel repository again on Friday, May
> 10 (M2) to bring the participation list up to date and will start the
> public shaming of those who have not followed the rules sometime
> thereafter.
>
> Per the December 2018 update to the EDP, project teams are not
> required to engage in a release review if they've engaged in one in
> the year leading up to their release date. No review is required. No
> PMC approval is required. No IP log review is required. /Remember that
> whether or not you engage in a review, project teams are required to
> follow the Eclipse IP Due Diligence Process. Your releases must only
> include IP that has been either "license certified" or "approved" by
> the IP Team. /I will initiate a scan of the repository tonight to
> ensure that unvetted IP has not been inadvertently added.
>
> Thanks for your attention.
>
> Wayne
>
> -- 
>
> Wayne Beaton
>
> Director of Open Source Projects | Eclipse Foundation, Inc.
>
>
> _______________________________________________
> cross-project-issues-dev mailing list
> [email protected]
> To change your delivery options, retrieve your password, or unsubscribe from 
> this list, visit
> https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
_______________________________________________
cross-project-issues-dev mailing list
[email protected]
To change your delivery options, retrieve your password, or unsubscribe from 
this list, visit
https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev

Reply via email to