Automated smoke report for 5.19.4 patch 
db76cb3c1e2e7b3cb18b6ea4cef832197fd90c8e v5.19.3-312-gdb76cb3
phoenix.squirrel.nl: Intel(R) Core(TM)2 CPU 6300 @ 1.86GHz (GenuineIntel 
1862MHz) (x86_64/2 cpu)
    on        linux - 3.9.10-100.fc17.x86_64 [fedora]
    using     cc version 4.7.2 20120921 (Red Hat 4.7.2-2)
    smoketime 9 hours 44 minutes (average 1 hour 13 minutes)

Summary: FAIL(X)

O = OK  F = Failure(s), extended report at the bottom
X = Failure(s) under TEST but not under harness
? = still running or test results not (yet) available
Build failures during:       - = unknown or N/A
c = Configure, m = make, M = make (after miniperl), t = make test-prep

v5.19.3-312-gdb76cb3  Configuration (common) none
----------- ---------------------------------------------------------
X X X X X X 
X X X X X X -Dusemorebits
X X X X X X -Duseithreads
X X X X X X -Duseithreads -Dusemorebits
| | | | | +- LC_ALL = nl_NL.utf8 -DDEBUGGING
| | | | +--- PERLIO = perlio -DDEBUGGING
| | | +----- PERLIO = stdio  -DDEBUGGING
| | +------- LC_ALL = nl_NL.utf8
| +--------- PERLIO = perlio
+----------- PERLIO = stdio 

Locally applied patches:
    SMOKEdb76cb3c1e2e7b3cb18b6ea4cef832197fd90c8e

Failures: (common-args) none
[stdio/perlio/nl_NL.utf8] 
[stdio/perlio/nl_NL.utf8] -DDEBUGGING
[stdio/perlio/nl_NL.utf8] -Dusemorebits
[stdio/perlio/nl_NL.utf8] -DDEBUGGING -Dusemorebits
[stdio/perlio/nl_NL.utf8] -Duseithreads
[stdio/perlio/nl_NL.utf8] -DDEBUGGING -Duseithreads
[stdio/perlio/nl_NL.utf8] -Duseithreads -Dusemorebits
[stdio/perlio/nl_NL.utf8] -DDEBUGGING -Duseithreads -Dusemorebits
Inconsistent test results (between TEST and harness):
    ../t/x2p/find2perl.t.................... 
.............................................. FAILED at test 1

-- 
Report by Test::Smoke v1.50 build 1367 running on perl 5.14.4
(Reporter v0.050 / Smoker v0.045)

Reply via email to