Automated smoke report for 5.9.3 patch 26357
impala: PPC_604 (PPC/1 cpu)
    on        AIX - 5.1.0.0/ML09
    using     cc version 6.0.0.13
    smoketime 1 day 21 hours 24 minutes (average 9 hours 4 minutes)

Summary: FAIL(F)

O = OK  F = Failure(s), extended report at the bottom
X = Failure(s) under TEST but not under harness
? = still running or test results not (yet) available
Build failures during:       - = unknown or N/A
c = Configure, m = make, M = make (after miniperl), t = make test-prep

   26357     Configuration (common) none
----------- ---------------------------------------------------------
O O O O     
F O O O     -Duse64bitint
- - - -     -Duseithreads
| | | +----- PERLIO = perlio -DDEBUGGING
| | +------- PERLIO = stdio  -DDEBUGGING
| +--------- PERLIO = perlio
+----------- PERLIO = stdio


Failures: (common-args) none
[stdio] -Duse64bitint
    ../ext/Time/HiRes/t/HiRes.t.............FAILED 17

-- 
Report by Test::Smoke v1.19 build 777 running on perl 5.8.7
(Reporter v0.018 / Smoker v0.016)

Reply via email to