Automated smoke report for 5.9.5 patch 29020
bison: PPC_604 (PPC/32/1 cpu)
on AIX - 4.3.3.0/ML11/32
using cc version 6.0.0.12
smoketime 1 day 9 hours 54 minutes (average 6 hours 46 minutes)
Summary: FAIL(X)
O = OK F = Failure(s), extended report at the bottom
X = Failure(s) under TEST but not under harness
? = still running or test results not (yet) available
Build failures during: - = unknown or N/A
c = Configure, m = make, M = make (after miniperl), t = make test-prep
29020 Configuration (common) none
----------- ---------------------------------------------------------
O O O O
O O X O -Duse64bitint
- - - - -Duseithreads
| | | +----- PERLIO = perlio -DDEBUGGING
| | +------- PERLIO = stdio -DDEBUGGING
| +--------- PERLIO = perlio
+----------- PERLIO = stdio
Failures: (common-args) none
[stdio] -DDEBUGGING -Duse64bitint
Inconsistent test results (between TEST and harness):
../ext/Time/HiRes/t/HiRes.t.............FAILED at test 23
--
Report by Test::Smoke v1.19 build 777 running on perl 5.8.7
(Reporter v0.018 / Smoker v0.016)