TIA
I'm currently running dbmail 2.0.11 on a live server with about 15GB of
current email. I need to upgrade to 2.2.
The problem is that the postgres migrate script is going to take a long
time to run with that much email and really, really don't want to take
down the server for that long. Is there any issues with leaving 2.0.11
running while migration is going on or once complete before shutting
down 2.0.11 and restarting with 2.2?
- [Dbmail] postgresql migrate 2.0 to 2.2 Rod K
- Re: [Dbmail] postgresql migrate 2.0 to 2.2 Jesse Norell
- Re: [Dbmail] postgresql migrate 2.0 to 2.2 Aaron Stone
- Re: [Dbmail] postgresql migrate 2.0 to 2.... Jesse Norell
- Re: [Dbmail] postgresql migrate 2.0 t... Paul J Stevens
- Re: [Dbmail] postgresql migrate ... Matthew T. O'Connor
- Re: [Dbmail] postgresql migr... Leonel Nunez
- Re: [Dbmail] postgresql migrate 2.0 to 2.... Rod K
- Re: [Dbmail] postgresql migrate 2.0 t... Aaron Stone
- Re: [Dbmail] postgresql migrate 2.0 to 2.... Tom Allison
