Package: release.debian.org
Severity: minor

Hi Release Team,

When existing events in https://debian.org
are modified (for example, trixie point release 13.8 and 13.9, where
LAST-MODIFIED was updated from 2026-05-23 to 2026-10-30), the VEVENT
SEQUENCE number remains at 1 instead of incrementing.

Per RFC 5545 Section 3.8.7.4, calendar clients such as Google Calendar
rely on an incremented SEQUENCE number to recognize changes to an
existing UID. Because SEQUENCE stays at 1, subscribed calendars silently
ignore date updates.

Could you please increment the SEQUENCE property whenever an existing
event is edited (and optionally include METHOD:PUBLISH at the VCALENDAR
level)?

Thanks!

Reply via email to