Package: release.debian.org Severity: minor Hi Release Team,
When existing events in https://debian.org are modified (for example, trixie point release 13.8 and 13.9, where LAST-MODIFIED was updated from 2026-05-23 to 2026-10-30), the VEVENT SEQUENCE number remains at 1 instead of incrementing. Per RFC 5545 Section 3.8.7.4, calendar clients such as Google Calendar rely on an incremented SEQUENCE number to recognize changes to an existing UID. Because SEQUENCE stays at 1, subscribed calendars silently ignore date updates. Could you please increment the SEQUENCE property whenever an existing event is edited (and optionally include METHOD:PUBLISH at the VCALENDAR level)? Thanks!

