Hi

this means uploads need to happen in August, as packages need to be in a
week before the point release date. Cheers!

----- Forwarded message from Jonathan Wiltshire <[email protected]> -----

Date: Mon, 29 Jul 2019 14:47:09 +0100
From: Jonathan Wiltshire <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], 
[email protected], [email protected], 
[email protected],
        [email protected]
Subject: Re: Scheduling 10.1 and maybe 9.10
Message-ID: <[email protected]>

Ok, we have a winner. Let's make them both 7th September so press aren't
under too much pressure.

-- 
Jonathan Wiltshire                                      [email protected]
Debian Developer                         http://people.debian.org/~jmw

4096R: 0xD3524C51 / 0A55 B7C5 1223 3942 86EC  74C3 5394 479D D352 4C51


----- End forwarded message -----

Attachment: signature.asc
Description: PGP signature

Reply via email to