Hello. I've got question related to closing bugs.
Let's say I adopted some package, and with the new upstream version
I should close some outstanding bugs. And I did it in 1.1-1 version.
Then I ask previous maintainer to upload it, and he pointed me out some
other needed changes. So I made another release 1.1-2 with those fixes.
Then previous maintainer uploaded it, but he built package without
`-v1.0` switch so only latest changelog was included.
This led to non-closed bugs which are fixed in fact.
What now? Should I close those bugs manually, or is it correct way to
upload another version (1.1-3) including changelogs from 1.1-1 to 1.1-3?
I mean is it good way? Then changelog from version 1.1-2 will be parsed
two times.
regards
fEnIo
--
_ Bartosz Feński | mailto:[EMAIL PROTECTED] | pgp:0x13fefc40 |
IRC:fEnIo
_|_|_ 32-050 Skawina - Głowackiego 3/15 - w. małopolskie - Polska
(0 0) phone:+48602383548 | Slackware - the weakest link
ooO--(_)--Ooo http://skawina.eu.org | JID:[EMAIL PROTECTED] | RLU:172001
signature.asc
Description: Digital signature

