Thomas Pierson <[email protected]> (22/05/2012):
> I have been notified that Clementine takes part of the boost1.49
> transition.[1]
> 
> I have some bugs fixes which are pending for an upload and one of them
> is an rc bug.
> 
> So I would like to ask you which time I need to plan before I can do a
> new upload for Clementine? Maybe that this is already possible?

The boost transition is a bit special; the bottom line is: don't worry
about it, upload your package as you see fit.

Thanks for checking with us anyway.

Mraw,
KiBi.

Attachment: signature.asc
Description: Digital signature

Reply via email to