Hello Brian and others,

[email protected] <[email protected]> (31/05/2012):
> I'm hoping to get your blessing, or seal of approval, or at least an
> "ah, go ahead!" to upload Eucalyptus to Sid in mid-June.

the safest course of actions is to get packages uploaded before
mid-June (possibly in good shape, since release critical bugs would
prevent migration to testing, so don't rush them either ;)), even if
those are not in their final shape. Letting small updates flow into
testing during the freeze is something that can be considered. Looking
at huge chunks isn't.

Mraw,
KiBi.

Attachment: signature.asc
Description: Digital signature

Reply via email to