In article <[EMAIL PROTECTED]> [EMAIL PROTECTED] writes:
>On Thu, Oct 27, 2005 at 02:46:06PM -0700, Blars Blarson wrote:
>> Vore is an Ultra-30 300Mhz with 512MB of ram. SCSI disks of course.
>Were not U30's dual processor capable? Then a simple additional 300MHz
>processor upgrade would be all that is needed. If it's configured to
>use both processors for building, that is. Those processors are fairly
>cheap on Ebay these days.
No, the Ultra-30 is a single processor machine. (I've got one.) I
think it was Sun's first PCI bus workstation. The ultra-60
dual-processor capable machine replaced it after 18 months or so.
--
Blars Blarson [EMAIL PROTECTED]
http://www.blars.org/blars.html
With Microsoft, failure is not an option. It is a standard feature.
--
To UNSUBSCRIBE, email to [EMAIL PROTECTED]
with a subject of "unsubscribe". Trouble? Contact [EMAIL PROTECTED]