[
https://issues.apache.org/jira/browse/DERBY-5975?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13504167#comment-13504167
]
Myrna van Lunteren commented on DERBY-5975:
-------------------------------------------
merged revision 1412392 and 1413812 to 10.9 with revision 1413885 and to 10.8
with revision 1413886
(http://svn.apache.org/viewvc?view=revision&revision=1413885 and
http://svn.apache.org/viewvc?view=revision&revision=1413886)
> intermittent nightly test failure across releases in
> Derby5937SlaveShutdownTest.testSlaveFailoverLeak
> -----------------------------------------------------------------------------------------------------
>
> Key: DERBY-5975
> URL: https://issues.apache.org/jira/browse/DERBY-5975
> Project: Derby
> Issue Type: Bug
> Components: Test
> Affects Versions: 10.10.0.0, 10.8.3.0, 10.9.2.0
> Environment: windows weme6.2
> Reporter: Mike Matrigali
> Attachments: DERBY-5975.diff, fail.zip
>
>
> Across multiple versions nightly tests have failed in
> Derby5937SlaveShutdownTest.testSlaveFailoverLeak.
> Subsequent to this no other test runs and thus we get no info printed to the
> log, and the ibm test
> reporter does not post anything other than a red box if the tests do not
> finish. Not sure if the
> tests are hanging as part of trying to clean up the failure or if the next
> test is hanging. Will post
> test runs that have failed in additional comments.
> So far I have only seen this on weme6.2 windows runs. Likely there is a
> timing issue that causes the
> test to fail and then bad cleanup of this test leads to hang. In the one
> stack I see as thread stuck
> in shutdown and a thread stuck waiting on the log.
> If no easy fixes for this it may make sense to disable this test in this one
> environment until someone
> wants to work on this one. Then we can at least get the rest of the testing
> to procede.
> (emb)jdbcapi.DatabaseMetaDataTest.testGetColumns_DERBY5274 used 343 ms .
> (emb)jdbcapi.DatabaseMetaDataTest.testDMDconnClosed used 79 ms Test upgrade
> done.
> Test upgrade from: 10.9.1.0, phase: POST UPGRADE
> .
> (emb)upgradeTests.BasicSetup.noConnectionAfterHardUpgrade used 156 ms Test
> upgrade done.
> .
> (emb)replicationTests.Derby5937SlaveShutdownTest.testSlaveFailoverLeak used
> 24221 ms F
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira