|
Reposting, but this time to the correct address... Having recently migrated from DateBk5 on a now-defunct Palm to Chandler on a UMPC and Tablet, one feature I'm really missing is a 'repeat from check off' function. Example: our ageing grandfather clock needs winding every 6 days. In DateBk, this is set up as an event repeating every 6 days, with a tick in the 'from check off' box. If I can't do it on the day, the overdue event continues to have 'Now' status until I get round to doing it, at which point marking it as done generates a repeat in six days time from now. This is ideal for those things that have to be done at regular intervals, but that can slip for a day or two: give cat worm tablet, check car tyre pressures, do monthly review, etc, where, having slipped, you don't want to go back to the original schedule. Hope this makes sense. Keith PS Can't believe how useful even 0.7 is - it just sort of works how I do! |
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Open Source Applications Foundation "Design" mailing list http://lists.osafoundation.org/mailman/listinfo/design
