Hello Jeremy, or anyone else affected,

Accepted gnome-calendar into kinetic-proposed. The package will build
now and be available at https://launchpad.net/ubuntu/+source/gnome-
calendar/43.1-0ubuntu1 in a few hours, and then in the -proposed
repository.

Please help us by testing this new package.  See
https://wiki.ubuntu.com/Testing/EnableProposed for documentation on how
to enable and use -proposed.  Your feedback will aid us getting this
update out to other Ubuntu users.

If this package fixes the bug for you, please add a comment to this bug,
mentioning the version of the package you tested, what testing has been
performed on the package and change the tag from verification-needed-
kinetic to verification-done-kinetic. If it does not fix the bug for
you, please add a comment stating that, and change the tag to
verification-failed-kinetic. In either case, without details of your
testing we will not be able to proceed.

Further information regarding the verification process can be found at
https://wiki.ubuntu.com/QATeam/PerformingSRUVerification .  Thank you in
advance for helping!

N.B. The updated package will be released to -updates after the bug(s)
fixed by this package have been verified and the package has been in
-proposed for a minimum of 7 days.

** Changed in: gnome-calendar (Ubuntu Kinetic)
       Status: In Progress => Fix Committed

** Tags added: verification-needed verification-needed-kinetic

-- 
You received this bug notification because you are a member of Desktop
Packages, which is subscribed to gnome-calendar in Ubuntu.
https://bugs.launchpad.net/bugs/1993308

Title:
  Update gnome-calendar to 43.1

Status in gnome-calendar package in Ubuntu:
  Fix Committed
Status in gnome-calendar source package in Kinetic:
  Fix Committed

Bug description:
  Impact
  ------
  There is a new bugfix release in the stable 43 series.
  https://gitlab.gnome.org/GNOME/gnome-calendar/-/blob/43.1/NEWS

  This includes several fixes for recurring calendar events. These bugs
  were considered a release blocker for Fedora 37.

  https://qa.fedoraproject.org/blockerbugs/milestone/37/final/buglist

  Test Case
  ---------
  Complete the test case from

  https://wiki.ubuntu.com/DesktopTeam/TestPlans/Calendar

  What Could Go Wrong
  -------------------
  GNOME Calendar is included by default only in the Ubuntu Desktop flavor.

  If there are bugs in GNOME Calendar, Evolution (not installed by
  default) could be used instead.

  GNOME Calendar can sync with Google or Microsoft online calendars.
  Therefore, bugs in editing calendar events can by synced to those
  services.

  GNOME Calendar is part of GNOME Core and is included in the GNOME
  micro release exception

  https://wiki.ubuntu.com/StableReleaseUpdates/GNOME

To manage notifications about this bug go to:
https://bugs.launchpad.net/ubuntu/+source/gnome-calendar/+bug/1993308/+subscriptions


-- 
Mailing list: https://launchpad.net/~desktop-packages
Post to     : [email protected]
Unsubscribe : https://launchpad.net/~desktop-packages
More help   : https://help.launchpad.net/ListHelp

Reply via email to