New color or icon in admin interface for time-base published pages
------------------------------------------------------------------
Key: MAGNOLIA-2303
URL: http://jira.magnolia.info/browse/MAGNOLIA-2303
Project: Magnolia
Issue Type: Improvement
Components: activation, admininterface
Affects Versions: 3.5.8
Environment: Not relevant
Reporter: Patrick Ehrensperger
Assignee: Philipp Bracher
Priority: Minor
Situation today:
If i schedule a page to publish in the future (time based publishing incl
activation), the status of the page in the admin interface remains red. This is
confusing because one may think, that the page has not yet been sent through
the activation process.
Desired situation:
Time base published pages should have a different color or icon in the status
column of the admin interface. This would indicate, that the page has been sent
through the activation process, but is not yet active.
Example:
1. Create new page on 2008-08-06 -> status red
2. Set time based publishing date to 2030-08-06 and send the page through the
activation process -> status blue (this is the new status that remains until
2030-08-06 and indicates that the page has been sent through the activation
process)
3. Automatic time based activation of the page on 2030-08-06 -> status green
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
http://jira.magnolia.info/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
----------------------------------------------------------------
for list details see
http://documentation.magnolia.info/
----------------------------------------------------------------