Messages may be lost when schedule them with a short delay
----------------------------------------------------------

                 Key: AMQ-3141
                 URL: https://issues.apache.org/jira/browse/AMQ-3141
             Project: ActiveMQ
          Issue Type: Bug
    Affects Versions: 5.4.2
            Reporter: Swen Moczarski
            Priority: Minor


The message scheduler has an optimization, that the schedule time will be 
aligned to seconds. All messages which included in the same second will be 
maintained in one store entry with a list of jobs. 
The list will be read from the store during the main loop, the entries will be 
executed and the list will be deleted from the store. When new messages are 
added on the same list during the scheduling, these messages could be lost.
One possible fix could be, that the main loop reads and removes the lists in 
one atomic step due to a synchronization. 


-- 
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.

Reply via email to