It would be useful to have a DAG.copy() method, then you could duplicate it
and change the schedule interval of the copy. I can't remember if there is
a copy() method though -- but I think theres a subdag method which
effectively does the same thing.

On Sun, Jun 5, 2016 at 2:17 PM <[email protected]> wrote:

> Hi,
> Is it possible to define a DAG with two different scheduling intervals?
> I have a DAG with 3 tasks defined in it, the schedule interval is
> "@weekly" but I also want to run it every month, without duplicate the
> entire DAG/code.
> Thanks

Reply via email to