[
https://issues.apache.org/jira/browse/AMBARI-8778?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14251127#comment-14251127
]
Hadoop QA commented on AMBARI-8778:
-----------------------------------
{color:red}-1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12687936/AMBARI-8778.patch
against trunk revision .
{color:green}+1 @author{color}. The patch does not contain any @author
tags.
{color:red}-1 tests included{color}. The patch doesn't appear to include
any new or modified tests.
Please justify why no new tests are needed for this
patch.
Also please list what manual steps were performed to
verify this patch.
{color:green}+1 javac{color}. The applied patch does not increase the
total number of javac compiler warnings.
{color:green}+1 release audit{color}. The applied patch does not increase
the total number of release audit warnings.
{color:red}-1 core tests{color}. The patch failed these unit tests in
ambari-server:
org.apache.ambari.server.api.services.KerberosServiceMetaInfoTest
Test results:
https://builds.apache.org/job/Ambari-trunk-test-patch/991//testReport/
Console output:
https://builds.apache.org/job/Ambari-trunk-test-patch/991//console
This message is automatically generated.
> Rolling Upgrade - Upgrade Pack needs a Cluster Post-Upgrade to Finalize
> -----------------------------------------------------------------------
>
> Key: AMBARI-8778
> URL: https://issues.apache.org/jira/browse/AMBARI-8778
> Project: Ambari
> Issue Type: Sub-task
> Components: ambari-server
> Affects Versions: 2.0.0
> Reporter: Alejandro Fernandez
> Assignee: Alejandro Fernandez
> Fix For: 2.0.0
>
> Attachments: AMBARI-8778.patch, Screen Shot 2014-12-17 at 7.33.42
> PM.png, Screen Shot 2014-12-17 at 7.33.49 PM.png, Screen Shot 2014-12-17 at
> 7.36.11 PM.png, Screen Shot 2014-12-17 at 7.38.54 PM.png
>
>
> The Upgrade Pack needs a group for Cluster Post-Upgrade that will have 2
> steps,
> 1. Custom Action to send the hdfs finalize command to the agent
> 2. Server Action to complete the upgrade by setting all of the host_versions
> and the cluster_version from upgraded/upgrading -> current.
> The Finalize can only happen once all hosts have been upgraded.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)