[ 
https://issues.apache.org/jira/browse/AMBARI-10819?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Florian Barca updated AMBARI-10819:
-----------------------------------
    Attachment:     (was: AMBARI-10819.0.patch)

> Ambari bootstrap: Premature Agent shutdown may lead to Agent stall
> ------------------------------------------------------------------
>
>                 Key: AMBARI-10819
>                 URL: https://issues.apache.org/jira/browse/AMBARI-10819
>             Project: Ambari
>          Issue Type: Bug
>          Components: ambari-agent, ambari-server
>    Affects Versions: 2.1.0
>         Environment: Linux all versions
>            Reporter: Florian Barca
>            Assignee: Florian Barca
>             Fix For: 2.1.0
>
>
> Currently, the bootstrap script shuts down the existing Agent before 
> attempting anything else. This is a problem, as any bug/malfunction that 
> terminates the execution before the new Agent is set up risks to leave the 
> old Agent stopped, so the machine becomes unresponsive. The logic needs to 
> account for potential failures and only restart the Agent after all the bits 
> have been deployed and the configuration has been properly set.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to