[ 
https://issues.apache.org/jira/browse/AMBARI-11016?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14535233#comment-14535233
 ] 

Hadoop QA commented on AMBARI-11016:
------------------------------------

{color:red}-1 overall{color}.  Here are the results of testing the latest 
attachment 
  http://issues.apache.org/jira/secure/attachment/12731422/AMBARI-11016.patch
  against trunk revision .

    {color:green}+1 @author{color}.  The patch does not contain any @author 
tags.

    {color:red}-1 tests included{color}.  The patch doesn't appear to include 
any new or modified tests.
                        Please justify why no new tests are needed for this 
patch.
                        Also please list what manual steps were performed to 
verify this patch.

    {color:green}+1 javac{color}.  The applied patch does not increase the 
total number of javac compiler warnings.

    {color:green}+1 release audit{color}.  The applied patch does not increase 
the total number of release audit warnings.

    {color:green}+1 core tests{color}.  The patch passed unit tests in 
ambari-server.

Test results: 
https://builds.apache.org/job/Ambari-trunk-test-patch/2662//testReport/
Console output: 
https://builds.apache.org/job/Ambari-trunk-test-patch/2662//console

This message is automatically generated.

> RU: Re-arrange manual steps in upgrade packs
> --------------------------------------------
>
>                 Key: AMBARI-11016
>                 URL: https://issues.apache.org/jira/browse/AMBARI-11016
>             Project: Ambari
>          Issue Type: Bug
>          Components: ambari-server
>    Affects Versions: 2.1.0
>            Reporter: Dmitry Lysnichenko
>            Assignee: Dmitry Lysnichenko
>             Fix For: 2.1.0
>
>         Attachments: AMBARI-11016.patch
>
>
> The goal is to run a *happy path *Rolling Upgrade in silent mode.
> For this, we should have manual steps either at the beginning (pre-reqs, 
> backups etc) or at the end (confirm finalize etc). Today, there are some 
> manual steps in the middle of RU for Hive, Storm, Oozie, Ranger (and maybe 
> others).
> As part of this task:
> Lets make a list of the manual steps that are presented to the user in the 
> middle or RU
> Lets try and move these manual steps to the beginning of RU if feasible.
> Note: We will have multiple upgrade packs now (Champlain->Champlain+, 
> Champlain->Dal, Dal-Dal+). We should make sure we fix all the upgrade packs.
> Moved Ranger backup manual step



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to