Hari Sekhon created AMBARI-11098:
------------------------------------

             Summary: Fast Offline Stack Upgrades (better than rolling upgrades 
in many cases)
                 Key: AMBARI-11098
                 URL: https://issues.apache.org/jira/browse/AMBARI-11098
             Project: Ambari
          Issue Type: New Feature
          Components: ambari-server, stacks
    Affects Versions: 2.0.0
         Environment: HDP 2.2
            Reporter: Hari Sekhon
            Priority: Critical


Feature Request to allow fast offline stack upgrades / downgrades instead of 
the only option being slow rolling upgrades.

Currently rolling upgrades take a very, very long time and there many hiccups 
in the process (pages of jiras on rolling upgrade problems).

For many people's clusters which are mainly doing batch analytics / data 
warehouse reports etc it's simply not necessary to try for the 100% uptime and 
waste all day(s) babysitting and rolling back every time there is any problem 
in the rolling upgrade, this in fact wastes a huge amount of operator time and 
blocks users getting their bug fixes or new features they need.

Operators should have the option of doing a fast and simple offline 
upgrade/downgrade:

1. Shut down entire cluster
2. Upgrade (or Downgrade) stack in parallel quickly across all nodes
3. Start up whole cluster again on different version

This is the difference between taking 30 mins or taking 8 hours to do an 
upgrade/downgrade and is preferable to only being allowed to do rolling 
upgrades. I've even done fast offline upgrade on another vendor in prod because 
sometimes it's just the better thing to do to get things finished quickly and 
allow users to utilize the fixes the upgrades provides immediately, especially 
where they're blocked on needing that upgrade or if wanting to very quickly 
roll back to a previous version after discovering some issue later (please also 
add arbitrary downgrades AMBARI-11097).

This would make testing much much faster and easier, and gives users access to 
new features or bug fixes they may be blocked on more quickly, rather than 
having to be blocked behind the long rolling upgrade process.



--